100 MVA Transformer ΓÇô Full Rewinding.jpg

Grid • National Grid

Rewinding of 133 MVA Transformer

Our team successfully executed a complete rewinding of 133 MVA transformers, managed from site to site with precision and expertise.
The scope included the re-engineering of the transformer windings carried out by our highly experienced team.
Both the High Voltage and Low Voltage windings were internally manufactured at our advanced facility, followed by curing using one of the largest Vapor Phase Drying (VPD) systems in the region ensuring optimal insulation performance and quality.
Subsequent activities included the tanking process, assembly, and preparation for Factory Acceptance Testing (FAT).
After successful testing, the transformer was safely transported and installed at the site, ready for reliable grid operation.
We specialize in transformer rewinding and refurbishment for national utilities and industrial power networks and infrastructure.

Client

National Grid

Location

Saudi Arabia

decor

Grid Projects

01
752 MVA.jpg

752 MVA Transformer Replacement Project

Technical Services carried out the replacement of a 752 MVA transformer, which involved dismantling the faulty unit and transporting a new transformer to destination.
The transportation process presented significant challenges due to the complexity of the route and logistical constraints.
Our dedicated team worked 24/7 to ensure the installation of the new transformer. The project scope included all associated work such as cable testing, supply and installation of a new Gas Insulated Busbar (GIB), and commissioning of protection system, and final safe energization.
This achievement reflects our ongoing commitment to reliability, technical excellence, and timely power infrastructure upgrades.

EXPLORE MORE
HProjects - HP Synchronous Motor.jpg

Overhauling and Rewinding of 25,000 HP Synchronous Motor

The project included disassembly, inspection, and testing of all components. A new set of coils was manufactured at our state-of-the-art coil production facility, ensuring precision and quality. This high-capacity motor was restored to deliver reliable, long-term operation, affirming our ability to handle large synchronous motor repairs up to 30,000 HP.

EXPLORE MORE
ATS Page-05.jpg

Onsite Stator Re-Wedging for Steam Turbine Generator 510,000 KVA

We executed onsite stator re-wedging of a steam turbine generator rated at 510,000 KVA, 24,000 V, and 3600 rpm. The work was carried out at one of SEC power plants using specialized tools and precision instruments.
This critical maintenance activity was performed with high accuracy to ensure long-term reliability and performance of the generator, minimizing downtime and maintaining operational excellence.

EXPLORE MORE
;